open cast coal mining
A project for the extraction of coal by opencast
methods from a site on the approved line of the Staveley-Brimington by-pass. Pending the construction of the road, the land has been returned to more beneficial agricultural use as previously it was low-lying and waterlogged. |
![]() |
|
![]() |
Planning permission had been refused for the scheme but on appeal, although the project was not directly linked to the road construction, the Inspector accepted that it was in the national interest to work mineral reserves in advance of development and not sterilise them. |
L O C A T I O N
S t a t i o n R o a d , B r i m i n g t o n C h e s t e r f i e l d D e r b y s h i r e C L I E N T F i t z w i s e L t d C O N T A C T N A M E R o b e r t F l e t c h e r |
t h e s t u d i o s m a n s f i e l d r o a d e d w i n s t o w e n o t t i n g h a m n g 2 1 9 n j :: p h o n e : [ 0 1 6 2 3 ] 8 2 2 0 0 6 :: f a c s i m i l i e : [ 0 1 6 2 3 ] 8 2 4 7 2 5 |
||